BERGLANDMILCH
PROJECT
Revitalization regulation salt bath
task / PROBLEM:
Due to a display damage on the salt bath system, it was no longer possible to operate the system properly. The old controller was originally supplied with a display. Since this was no longer available, the plant was thus no longer operable.
Old control distributor
Old schematic diagram
Old schematic diagram
solution
With regard to the cost / benefit efficiency, a new controller incl. display was integrated into the old cabinet and adapted in terms of control technology. The circuit diagram documentation was completely redesigned with EPLAN ProPanel and adapted to the existing control cabinet.
New schematic diagram
New schematic diagram